Colchester, Essex – 12 Houses

We were appointed the last minute for this job and were able to mobilise on site at short notice and complete the piling and groundworks for 12 houses.

Service: Structural

Length of Project: 18 weeks

Loughton, Essex – 6 Unit Scheme

Working as the main contractor for this developer, we produced a fully kitted out 6 unit scheme from scratch. Upon completion, the flats were all occupied within a week. We were proud to be able to meet this timeline for our client.

Service: Structural

Length of Project: 14 months

Wandsworth, London – House Refurbishment

We had to underpin the rear of the property, install a basement and fully refurbish this beautiful home.

Service: Underpinning

Length of Project: 16 months

Camden, London – Mixed Use

The developer on this project has us work on a basement from a level site and the RC frame for a 6 storey building. Underpinning and waterproofing also made up part of these work.

Service: Basement

Length of Project: 22 Months

Pittshanger Manor and Café, Ealing

4SP Group excavated and built the basement, lift shaft and internal structural works for the Museum. We then built the café from foundations to completing the whole envelope with a brick finish. These works were all done for the main contractor. Service: Basement Length of Project: 19 months
scaffolding

Greenwich, London – 61 Unit Student Scheme

Here we helped the main contractor on a very time constrained project with the clearance of the previous warehouse and installing foundations in an area where there is a high UXO risk.

The 4 storey concrete frame for this high end student scheme had the rooms and upper level corridors built from modular construction. 4Site took care of all the concrete elements as well as the external landscaping and utility runs. 4Site worked right through Covid to help the client achieve their deliverable.

Service: Foundations

Length of Project: 18 months

Bushey, Hertfordshire – Mixed Unit Scheme

4SP Group carried out the piling on this project directly for a developer, along with the private utility runs and drainage. A very constrained site with challenging logistics, we worked hand in hand with the client on a busy main road.

Service: Piling

Length of Project: 4 months

Ealing, London – 36 Unit Scheme

Comprising of 3 separate blocks, this site was severely constrained. 4SP Group carried out all the piling ground works for this stunning development for all 3 blocks with the required drainage and utilities. 4SP Group worked here directly for the developer.

Service: Piling

Length of Project: 6 Months